Tabing UAV test flight report Dec 14, 2011

The damaged UAV was repaired by three skilled engineers within a day.
On Dec. 14, the third test flight was conducted.

The UAV left the ground successfully at 1100LT and fly around the
runway area to check the UAV condition and the fuel consumption.
Thirty minutes later, UAV landed manually on the ground unsuccessfully.
It bounced several times and wheel replaced yesterday was broken again.
Also, some cracks were found on the body, must and tail.
Now, UAV needs to be repaired and we are purchasing necessary items.
Also sounding system with GPS and Iridium communications have some troubles.
The system is very unstable and hung up immediately after starting flights.
We hope we can fix these problems.