Tuesday 13 December 2011

Fw: Report BPD Pontianak Observation number 26



----- Forwarded Message -----
From: Lapan Pontianak <lapanpontianak@yahoo.com>
To: "satreps.iop.2011@blogger.com" <satreps.iop.2011@blogger.com>
Cc: "fadlihiro@yahoo.com" <fadlihiro@yahoo.com>; TIMBUL MANIK Yahoo <timbulm@yahoo.com>; Wahid Heryanto <wahidheryanto@yahoo.com>; Iskandar Bakri_yahoo.co.id <iskandar_lapan@yahoo.co.id>
Sent: Tuesday, December 13, 2011 7:57 PM
Subject: Report BPD Pontianak Observation number 26

Radiosonde Observation log
Station
Pontianak (LAPAN Observatory)
Position
0.00 0 S,109.370 E
Altitude
1m MSL

Report BPD Pontianak Observation number 26

Radiosonde Observation log
 
Station
Pontianak (LAPAN Observatory)
Position
0.00 0 S,109.370 E
Altitude
1m MSL
 
Date (YYYY/MM/DD
2011 /12 /13
Observation Members
Juliansyah, Reza, Adi chandra
Observation Number
26
Observation Time
 12  (UTC)
Radiosonde Number
Radiosonde Frequency
G2354202
404.50 MHz
Ground Check
Reference
P(hPa): 1008,0
T(0C) : 26,0
RH (%): 0
Difference
P (hPa): -0,1
T(0C) : -0,1
RH (%): 0
Sonde Release Time
18.30  LST
Observation End Time
19:39:58
Flight Direction (16 direction)
North West
Maximum Elevation
21280
Archive File Name
111213 / 111213.002
Weather Condition
Cloudy
Cloud Amount
6/8   Octus
Surface
Pressure
1007.8      (hPa)
Temperature
26.5         (0C)
Relative Humidity
100      (%)
Surface Wind Direction
135   (deg)
Suferface Wind Speed
0.0   (m/s)
Comments
-       Balloon launched succused
-       At the 9249 gpm and at the 29.22 min, MW 15 Receiver Showed " *No PTU Signal". And also at 9944 gpm in the 31.18 min
 

AWS and disdrometer at Sicincin

According to information from Pak Sugeng of BMKG on 12th, AWS and
disdrometer at Sicincin are working well.

Hideyuki Kamimera
Research Institute for Global Change
Japan Agency for Marine-Earth Science and Technology
Email: kamimera@jamstec.go.jp Ph./fax: +81-46-867-9278/-9255

Tabing UAV test flight report Dec 13, 2011

The second test flight of UAV was conducted to check the automatic
takeoff and automatic landing.
The UAV left the ground successfully at 1003LT and fly around the
runway area about 30 minutes .
However, the automatic landing was failed. UAV was affected by
crosswind and hit the wheel against guide light on the runway
unfortunately.
Now, UAV is in the process of repair the broken wheel, mast and damaged body.
We hope it can be repaired soon.

Best regards,
Miki

Observation Preparation of UAV

Here is the short report of UAV's observation preparation :
Setup the UAV
The Team  (Dr. Suichi Mori, Dr. Miki Moteki, Mr.Toshiro Takahashi, Mr. Kazuhiko Hayashi, Mr. Yoshio Aoki, and Sopia Lestari) started to do the preparation on Sunday, December 11, 2011. Firstly, the engineers unpacked and set up the uav. We still could not do the test flight today.

Re: Re: Re: BJ-III on stationary observations

Dear colleagues,
BJ is continuing observations. Weather is fine and wind is very calm.
CINDY team suggests that BJ is in a cloud activity suppression phase.
Regards, MDY

mdy@mvc.biglobe.ne.jp wrote:
> Dear colleagues,
> BJ is continuing observations without serious problems. A bad weather
> has finished until Saturday, and a good weather starts since Sunday.
> No wind is 4-5 m/s and wave is 1-2 m.
>
> The stationary observations will continue until 06 UT (13 WIB) Dec.16,
> and all the observations will be terminated when BJ returns into EEZ
> at around 06 UT, Dec.18.
>
> Regards,
> MDY
>
>

Report Observation Number 25

Radiosonde Observation log
Station
Pontianak (LAPAN Observatory)
Position
0.00 0 S,109.370 E
Altitude
1m MSL

Fw: Daily report from Sipora (December 12, 2011)

----- Forwarded Message -----
From: Susialita Doang <susialita@yahoo.com>
To: "satreps.iop.2011@blogger.com" <satreps.iop.2011@blogger.com>
Cc: "susialita@yahoo.com" <susialita@yahoo.com>
Sent: Tuesday, December 13, 2011 4:25 AM
Subject: Daily report from Sipora (December 12, 2011)

Dear all,
This is daily report from Sipora on December 12, 2011.
--------------------------------------------------------------------------------------------------------------------------------------------------------------
 UTC                                    00                                06                                12                                18
Sonde released (LT)            06:30                           12:30                           18:30                           00:30
Max. elevation (km)            22.970                         23.217                         20.396                         19.091
Weather condition               cloudy                          cloudy                          cloudy                          cloudy

BMKG Tabing Rawinsonde

Report BMKG Tabing (06 UTC, Dec 12, 2011)
1.Launching 46
2.Max Height : 31.678 km
3.Weather (very cloudy)
4.T/P/RH/ :30.2 C/1010.3 m/69%

Report BMKG Tabing (12 UTC, Dec 12, 2011)
1. Launching 47
2. Max Height : 17,825 km
3.Weather : Very Cloudy
4. T.28,1C P.1008,4 mb RH.70 %

Report BMKG Tabing (18 UTC, Dec 12, 2011)
1.Launching 48
2.Max height : 17,611 km
3.Weather : Rain
4. T.24,0C P.1010,6 mb RH.90 %

-BMKG Tabing-
Powered by Telkomsel BlackBerry®

Tabing UAV observation report Dec 12, 2012



The first test flight of UAV was successfully conducted at 1630LT on Dec 12.
Miki

Starting time of rainfall at Muara Putus

Dear Ardhi,

Thank you very much for your report.

By the way, just to make sure, I have a question about the starting time
of rainfall at Muara Putus in the evening of 11th. According to the AWS
observation there, it started to rain at 1840 LT. But your report
mentioned that the starting time was around 1730 LT. Does it mean that
very light rain already started at the time there?

Best regards,
Hideyuki

Hideyuki Kamimera
Research Institute for Global Change
Japan Agency for Marine-Earth Science and Technology
Email: kamimera@jamstec.go.jp Ph./fax: +81-46-867-9278/-9255